General
Inventory list
Identifier
|
Title | Level of description | Date | Digital object | |
|---|---|---|---|---|---|
| G.X 19/1/31 | Financing of New Electric Power projects, Covering of Peak Loads and Rationalisation of Electric Power Consumption | File | 1958.05-1959.04 | ||
| G.X 19/1/32 | Technical co-operation East-West contacts | File | 1953.12-1965.03 | ||
| G.X 19/1/34 Part 2 | Covering of peak loads | File | 1963.01-1963.01 | ||
| G.X 19/1/34 Part B | Covering of peak loads (Réponses des pays a la lettre du 1er octobre 1959) - | File | 1953.01-1960.06 | ||
| G.X 19/1/37 Part 1 | Symposium on Rationalization of Electric Power consumption, Warsaw 1962 | File | 1960.07-1961.09 |